Thats pity. Those very useful things are not being told to public. N-power plant installation is very expensive so initial cost is very high for the electricity but in the long run it may come down until unless uninterrupted supply of fissile material is ensured. Enriched uranium is also very costly fuel and going to be costlier soon. The end result will be no different than in crude oil case. Now we are dependent on OPEC and that time we'll be on NSG.